| US Route | State Route | Main County | Additional County | Description | Estimated Completion Date | Division |
| U.S. 82 | AL 6 | Bibb | N/A | Road and bridge work consisting of grade, drain and bridge culvert on new location from east of AL 25 in Centreville to east of CR 20. Heavy equipment working in and around roadway intersections. | Winter 2013 | 5 |
| I-65 | | Butler | Lowndes | Road and bridge work consisting of planing, resurfacing, traffic striping, bridge rail retrofit from 0.6 mile south of Lowndes County line to AL 97 at Letohatchee. Reduced speeds and possible delays. Daytime lane closures. | Summer 2012 | 6 |
| U.S. 278 | AL 74 | Calhoun | N/A | Road and bridge work consisting of grade, drain, base and pave, bridge removal, bridges and culverts from Industrial Blvd to northeast of Piedmont. Delays and lane closures possible. | Winter 2014 | 4 |
| I-20 | | Calhoun | Talladega | Road and bridge work consisting of additional lanes,grade, drain, base and pave and bridge raising from west of Bentley Parkway to east of Snow Creek in Oxford. Lane closures possible. | Spring 2013 | 4 |
| Anniston Eastern Bypass | | Calhoun | N/A | Road and bridge work consisting of grade, drain, partial base and pave, bridge, culvert and bridge removal from 1500 feet south of Lake Yahou to U.S. 431 at Saks. | Summer 2012 | 4 |
| U.S. 29 | AL 15 | Chambers | N/A | Road and bridge work consisting of grade, drain, base and pave, signals, underground storage tank removal, soil remediation, bridge replacement and approaches at Osanippa Creek in Fairfax. | Fall 2012 | 4 |
| U.S. 84 | AL 12 | Coffee | N/A | Road work consisting of additional lanes, widening, grade, drain, base and pave, signing, and bridge culverts from west of Double Bridges Creek at New Brockton to Enterprise Bypass. Delays and lane closures possible. | Fall 2012 | 7 |
| I-65 | | Conecuh | N/A | Road work consisting of planing, resurfacing, traffic striping, guardrail and safety improvements from Murder Creek to Butler County line. Delays and lane closures possible. | Summer 2013 | 9 |
| I-59 | | Dekalb | N/A | Road work consisting of concrete pavement rehabilitation, shoulder resurfacing, deceleration lane construction and rebuilding median flume from Etowah County line to south of Al 35 in Fort Payne. Equipment working adjacent to roadway. | Summer 2013 | 1 |
| I-65 | | Elmore | Autauga | Road and bridge work consisting of pavement rehabilitation, bridge rail retrofit, gaurdrail and additional lanes from north of Crescent Lake bridge to north of Autauga County line. Reduced speeds and possible delays. | Fall 2012 | 6 |
| AL 41 | | Escambia | Conecuh | Road work consisting of grade, drain, base and pave, and additional lanes at various locations between Brewton and I-65. Off-site detour. | Spring 2012 | 9 |
| I-59 | | Etowah | N/A | Road and bridge work consisting of clearing, concrete pavement rehabilitation, guardrails, bridge raising and widening from 0.6 miles south of Attalla north city limits to end of bridge over CR 276 at Duck Springs. | Summer 2012 | 1 |
| AL 77 | | Etowah | N/A | Road and bridge work consisting of additional lanes, grade, drain, base and pave, underground storage tank removal, soil remediation, signals and bridge culvert from Steele station Road to I-59 ramps in Rainbow City. Delays and lane closures possible. | Fall 2012 | 1 |
| AL 24 | | Franklin | N/A | Road and bridge work consisting of additional lanes, grade, drain, partial base and pave, bridge culvert extensions and bridge from Dempsey to CR 524. Heavy equipment working in and around roadway. | Summer 2012 | 2 |
| AL 24 | | Franklin | N/A | Road and bridge work consisting of partial grade and drain, base and pave, signing, striping and bridge coating from Mississippi state line to AL 247. Heavy equipment working in and around roadway. | Winter 2013 | 2 |
|