| US Route | State Route | Main County | Additional County | Description | Estimated Completion Date | Division |
| U.S. 82 | AL 6 | Autauga | N/A | Road work consisting of grade, drain, base and pave, additional lanes, signals and signing from near Al 206 to Al 14 in Prattville. Reduced speeds, lane closures and lane shifts. | Summer 2013 | 6 |
| I-10 | | Baldwin | N/A | Road and bridge work consisting of interchange, grade, drain, base and pave, signs and bridges at CR 68 with connector to Baldwin Beach Express. Delays and lane closures possible. | Fall 2014 | 9 |
| I-10 | | Baldwin | N/A | Road and bridge work consisting of guardrail, planing,resurfacing, drain, acceleration lane extension and bridge rail retrofit from AL 59 north of Loxley to CR 64. Delays and lane closures possible. | Fall 2013 | 9 |
| AL 67 | | Blount | Cullman | Road and bridge work consisting of grade, drain, base and pave, bridge removal and replacement at Mulberry Fork of the Black Warrior River north of Rosewell. heavy equipment working adjacent to roadway. Delays and lane closures possible. | Fall 2014 | 1 |
| I-20 | | Calhoun | N/A | Road work consisting of pavement rehabilitation, additional lanes, grade, drain, base and pave, bridge widening ang raising from snow Creek bridge in Oxford to Cleburne County line. delays and lane closures possible. | Fall 2013 | 4 |
| I-20 | | Calhoun | | Road and bridge work consisting of additional median lanes, grade, drain, base and pave, bridge replacements and signals from H. J. Bentley Parkway bridge to east of Snow Creek bridge in Oxford. Lane closures possible at night. | Summer 2013 | 4 |
| U.S. 278 | AL 74 | Calhoun | N/A | Road and bridge work consisting of grade, drain, base and pave, bridge removal, bridges and culverts from Industrial Blvd to northeast of Piedmont. Delays and lane closures possible. | Summer 2014 | 4 |
| U.S. 29 | AL 15 | Chambers | N/A | Road and bridge work consisting of grade, drain, base and pave, signals, underground storage tank removal, soil remediation, bridge replacement and approaches at Osanippa Creek in Fairfax. | Spring 2013 | 4 |
| I-20 | | Cleburne | N/A | Road and bridge work consisting of pavement rubblization, grade, drain, base and pave, bridge raising, signing and lighting modifications on additional lanes from AL 46 in Heflin to west of the Tallapoosa River. Delays and lane closures possible. | Spring 2015 | 4 |
| I-20 | | Cleburne | | Road and bridge work consisting of additional lanes, grade, drain, base and pave, pavement rehabilitation, bridge widening and signing from west of Tallapoosa River to east of CR 49. Delays and lane closures possible. | Fall 2013 | 4 |
| U.S. 84 | AL 12 | Coffee | N/A | Road work consisting of additional lanes, widening, grade, drain, base and pave, signing, and bridge culverts from west of Double Bridges Creek at New Brockton to Enterprise Bypass. Delays and lane closures possible. | Summer 2013 | 7 |
| U.S. 84 | AL 12 | Coffee | N/A | Road work consisting of partial grade and drain and base and pave from 3500 feet west of al 141 to CR 364 / AL 203 intersection in Elba. Delays and lane closures possible. | Summer2014 | 7 |
| AL 133 | | Colbert | N/A | Road work consisting of widening, grade, drain, base and pave, signing and signal modifications from north of Norfolk Southern Railway bridge to 700 feet south of Avalon Avenue in Muscle Shoals. Delays and lane closures possible. | Fall 2013 | 2 |
| I-65 | | Conecuh | N/A | Road work consisting of planing, resurfacing, traffic stripe, drainage, guardrail, safety improvements and resurfacing rest areas from near CR 6 interchange to Murder Creek in Evergreen. Delays and daytime lane closures. | Fall 2014 | 9 |
| U.S. 84 | AL 12 | Covington | N/A | Bridge work consisting of bridge replacements and approaches at Yellow River and relief southeast of Sanford. Reduced speeds and lane closures. | Spring 2014 | 7 |
|